Year

2021-2023

Client

Mindvalley

Role

Head of
Media Design

Team

Design, Marketing

Scope

Vendor strategy, production operations, localization, launch delivery, and quality assurance

Team

Design, Marketing

Scope

Vendor strategy, production operations, localization, launch delivery, and quality assurance

Role

Head of Media Design

Client

Mindvalley

Year

2021-2023

Building a Scalable Web Production Partnership

How I established and governed an external delivery model for 242 tracked production deliveries from 2021–2023

The image featured in the middle of the about us page
The image featured in the middle of the about us page

A partnership between Mindvalley and Dox Digital

Challenge

Growth had outpaced internal implementation capacity

Mindvalley shipped a continuous stream of customer-acquisition experiences, including:

Masterclass Launches

Product Pages

Certification Pages

Video Sales Pages

Campaign Pages

Localization Releases

An example customer-acquisition page supported by the model

Each delivery required design, implementation, content and asset preparation, QA, and launch coordination—often across multiple languages. Internal teams could not absorb every delivery without compromising design direction, quality oversight, or sustainable workloads.

Marketers also needed to reduce redundant work such as content population and manual page setup—tasks that had previously required specialist support.

The answer was not simply to outsource work. It was to build a reliable external production model that expanded capacity while keeping quality, cost, and ownership visible.

Partnership Model

I turned external capacity into a governed production partnership

Dox Digital

I helped establish DOX Digital as an extension of Mindvalley’s web-production capability. Its role was defined around web page implementation and production support, including content implementation, image optimization, metadata, and launch readiness. Internal teams retained ownership of design direction, prioritization, and final approval.

DOX Digital’s monthly retainer scope of work

The relationship was structured around planned retainer capacity as well as separately scoped ad hoc work. This distinction made the partnership sustainable. Recurring work could be planned against agreed capacity, while new or expanded requests required an explicit review of scope, timing, and cost.

I participated in those commercial discussions, reviewing estimates, requesting transparent effort breakdowns, and challenging assumptions where necessary. The objective was to connect external spend to a clear delivery outcome—not treat the partner as an uncontrolled overflow queue.

Why a Partner Model Was More Scalable

PARTNERING WITH DOX DIGITAL

SCALING ENTIRELY IN-HOUSE

Defined web-production work could be delivered by dedicated external capacity

Requires an increase in headcount to support production needs

Production support was available outside standard working hours, including weekends

24 hour production support available (Weekends included)

Production support available between Monday - Friday

Dedicated resources could support multiple Mindvalley teams and concurrent launches

Limited resources available and are allocated based on company priorities

Avoided the fully loaded cost of expanding the team by six additional hires

Required six additional hires, plus EPF, SOCSO, bonuses, and benefits.

Projected annual savings of over RM100,000

Based on a 12-month comparison between the DOX Digital partnership and the fully loaded cost of hiring six additional in-house production roles.

Key highlights presented to leadership for the outsourcing approval

Operating Rhythm

Every release moved through one visible workflow

For the partnership to work at speed, DOX needed more than a Figma link. Each request was prepared with the information needed for production: Page DNA references, copy and assets, SEO requirements, videos or widgets, checkout dependencies, QA expectations, and localization details.

The partnership used structured production specifications and Airtable tickets to make those dependencies visible before implementation began. Tickets showed ownership, status, QA, and next actions, while Slack provided a shared space for questions, decisions, handoffs, and launch confirmation.

This created a dependable operating rhythm:

Scope → production-ready brief → DOX implementation → QA → launch support

The system reduced last-minute ambiguity and made blockers visible early enough for the right people to act.

Airtable made ownership and implementation status visible

A Google Sheet template captured the information DOX needed to build each page

Slack kept launch decisions and blockers in one shared thread

Scaling Delivery

The model supported English and international releases in parallel

Localization was a parallel production stream, not a final task after an English release. Each version needed implementation, review, and release while new English launches and other requests continued to move through the pipeline.

Shared production schedules made that capacity visible across months. They helped coordinate English and international work together, sequence delivery against launch dates, and determine when internal or vendor support was needed. The DOX engagement covered a substantial mix of English launches and relaunches, certifications, product pages, international funnels, and international product pages.

Shared timelines coordinated English and international releases

Quality was maintained through standards already established by the internal team. DOX implemented work within Mindvalley’s existing Storyblok CMS and Design DNA. These foundations were not the focus of the partnership; they provided the guardrails for a consistent live experience.

Mindvalley homepage localization to Spanish

Outcome

From external support to operational leverage

Between 2021 and 2023, the DOX Digital channel recorded 242 production deliveries. This included launches, localized releases, product pages, migrations, experiments, and live-event pages. Separate language releases were tracked individually, reflecting the real production workload behind international delivery.

The partnership combined external capacity with clear commercial, operational, and quality control:

242 Tracked Deliveries
Across launches, pages, experiments, and releases

242 Tracked Deliveries
Across launches, pages and releases from 2021–2023

88 Language-Specific Releases
Across English, Spanish, French, German, Italian, and Russian

RM100,000+ Projected Annual Savings
Compared with six additional in-house hires

A Governed Delivery Model
Connecting scope, implementation, QA, localization, and launch support